Hot-selling Making A Laminated Beam - H20 Timber Beam Wall Formwork – Lianggong
Hot-selling Making A Laminated Beam - H20 Timber Beam Wall Formwork – Lianggong Detail:
Product Details
Wall formwork consists of H20 timber beam, steel walings and other connecting parts. These components can be assembled formwork panels in different widths and heights, depending on the H20 beam length up to 6.0m.
Steel walings required are produced in accordance with specific project customized lengths. The longitudinally-shaped holes in the steel waling and waling connectors result in continuously variable tight connections (tension and compression). Every waling joint is tightly connected by means of a waling connector and four wedge pins.
Panel struts (also called Push-pull prop) are mounted on the steel waling, helping formwork panels erection. The length of panel struts are selected according to the height of the formwork panels.
Using the top console bracket, working and concreting platforms are mounted to the wall formwork. This consists of: top console bracket, planks, steel pipes and pipe couplers.
Advantages
1. The wall formwrok system is used for all types of walls and columns, with high rigidity and stability at low weight.
2. Can choose whichever form face material best meets your requirements – e.g. for smooth fair-faced concrete.
3. Depending on the concrete pressure required, the beams and the steel waling are spaced closer or apart. This ensures optimum form-work design and the greatest economy of materials.
4. Can be pre-assembled on site or before arrival at site, saving time, cost and spaces.
5. Can match well with most Euro formwork systems.
The assembly process
Positioning of walers
Lay walers on the platform at the distance shown in the drawing. Mark the positioning line on the walers and draw the diagonal lines. Let the diagonal lines of the rectangle that is composed by any two walers equal to each other.
Timber beam assembling
Lay a timber beam at both ends of the waler according to the dimension shown in the drawing. Mark the positioning line and draw the diagonal lines. Make sure the diagonal lines of the rectangle that is composed by two timber beams equal to each other. Then fix them by flange clamps. Connect the same end of the two timber beams by a thin line as the benchmark line. Lay other timber beams according to the benchmark line and ensure that they are parallel to timber beams on both sides. Fix each timber beam with clamps.
Installing lifting hook on timber beam
Install lifting hooks according to the dimension on the drawing. Clamps must be used on both sides of the timber beam where the hook is located, and ensure that the clamps are fastened.
Laying panel
Cut the panel according to the drawing and connect the panel with the timber beam by self-tapping screws.
Application
Product detail pictures:
Related Product Guide:
Every member from our high efficiency sales team values customers' needs and business communication for Hot-selling Making A Laminated Beam - H20 Timber Beam Wall Formwork – Lianggong , The product will supply to all over the world, such as: Armenia, United Kingdom, Grenada, When you are keen on any of our items following you view our product list, please feel free to make contact with us for inquiries. You'll be able to send us emails and get in touch with us for consultation and we shall respond to you as soon as we are able to. If it's convenient, you could find out our address in our web site and come to our enterprise. or additional information of our items by yourself. We're generally ready to build lengthy and steady co-operation relations with any possible shoppers within the associated fields.
By Anastasia from Marseille - 2018.04.25 16:46
The company account manager has a wealth of industry knowledge and experience, he could provide appropriate program according our needs and speak English fluently.
By Albert from Hungary - 2017.03.08 14:45