Pipe Gallery Trolley
Product Details
The working principle is simple and structurally rational: all loads generated by the fresh concrete are transmitted through the formwork support system into the trolley gantry, and from the gantry through extended adjusting supports into the traveling troughs and the ground. The hydraulic lifting system is used for adjustment only and does not carry construction loads, which gives the system large rigidity, convenient operation and a high safety factor.
The system is configured from two formwork families and two traveling systems. The steel panel system uses a 6 mm steel plate with [8 channel-steel secondary joists and double [1 channel-steel main joists, bolted on the side; the timber panel system uses an 18 mm imported WISA board with H2 timber beams and double [12 channel-steel main joists. The semi-automatic traveling system is pulled forward by a hoist or similar device, while the fully automatic system carries electric traveling wheels and moves forward or backward at the push of a button.
Once assembled, the trolley is never dismantled: after each pour it lifts, retracts its adjusting supports, travels to the next segment and casts again. Formwork erection for one standard segment takes about half a day under normal site conditions, and long-term turnover shortens the construction period and reduces labor cost. A standard unit runs on four sets of traveling wheels, with the front and rear pairs sharing one traveling trough.
Specifications
| Item | Specification |
| Model | TC-120 pipe gallery trolley system |
| Manufacturer | Yancheng Lianggong Formwork Co., Ltd (founded 2010, Yancheng, Jiangsu, China) |
| Steel panel system | 6 mm steel plate; [8 channel secondary joists; double [10 channel main joists; bolted side connection |
| Timber panel system | 18 mm imported WISA board; H20 timber beam secondary joists; double [12 channel main joists; special connecting clips |
| Traveling system | Semi-automatic (winch pulling) or fully automatic (electric traveling wheels, push-button) |
| Traveling wheels | 4 sets per trolley unit; front and rear pairs in the same [16 channel traveling trough |
| Formwork erection time | About half a day per standard segment (site conditions dependent) |
| Formwork alignment tolerance | ≤ ±5 mm per trolley unit |
| Pouring control | Symmetric pouring; level difference between walls ≤ 0.6 m |
| Hydraulics | 46# hydraulic oil; lifting system for adjustment only, not carrying construction loads; oil replaced every 6 months |
| Base preparation | Invert and connection walls cast first; formwork overlaps 100 mm down the walls |
| Maintenance | Monthly inspection of members, bolts, pins, circuits and cylinders by a dedicated person |
| Customization | OEM & ODM accepted; cross-section customized per drawings |
Applications of Pipe Gallery Trolley
1. Municipal comprehensive utility tunnels: casting the standard segments of underground pipe galleries that integrate electric power, telecommunication, gas, heat, water supply and drainage systems in urban districts.
2. Power and telecommunication cable corridors: dedicated underground cable tunnels built segment by segment with a fixed cross-section.
3. Water supply and drainage conduits: box-section channels for municipal water conveyance and drainage networks.
4. Gas and heating duct corridors: underground protective channels for city gas and district heating lines.
5. Standard straight segments in new development zones and municipal infrastructure upgrades, where repetitive segment lengths favor a reusable trolley over loose formwork.
Advantages of Pipe Gallery Trolley
1. Fast cycle: formwork erection for one standard segment takes about half a day, and curing time is used to prepare the next unit's rebar, so the schedule overlaps instead of waiting.
2. Assemble once, reuse continuously: after one-time assembly the system is never dismantled; long-term turnover reduces labor cost and shortens the construction period.
3. Rational load path and high rigidity: all concrete loads pass through the support system into the gantry; the lifting system only adjusts and never carries the pour, keeping the safety factor high.
4. Large operating space: the open interior makes work easier for crews and leaves room for supervisors and visitors to inspect safely.
5. Fewer components, less waste: quick and easy to install, fewer parts to lose, and easier site cleaning than loose formwork.
6. Precise and controllable: side formwork is closed to a tolerance of ±5 mm per unit, and concrete is poured symmetrically with a wall-to-wall level difference of no more than .6 m to prevent eccentric loading.
Service
Customization and Engineering Services
- 3D structural deepening design and load calculations based on your DWG/PDF drawings.
- Factory pre-assembly and quality inspection before shipment.
- Full set of accessories available including tie rods, water-stop plates, turnbuckles, and traveling trolleys.
- Detailed assembly drawings, user manuals, and technical support.
Packaging and Shipping
- Standard export bundling with protective steel strapping and wooden/steel pallets.
- Optimized panel sizes suitable for standard 20GP, 40GP, 40HQ, or Open Top containers.
- Supported trade terms: FOB, CIF, CFR, DDP, EXW.
Frequently Asked Questions
Q1: Can this formwork be customized to our specific project dimensions?
A1: Yes. All box culvert and pipe gallery formwork systems are fully customized according to your structural drawings, including single-cell, double-cell, and multi-chamber layouts.
Q2: How many times can the steel formwork be reused?
A2: With regular cleaning, release agent application, and proper maintenance, our steel formwork can achieve over 50 to 100 reuses.
Q3: How do you solve the inner mold stripping and traveling in long culverts?
A3: We provide mechanical screw retraction or hydraulic collapsing inner mold systems paired with bottom traveling trolleys for easy and fast relocation.
Q4: What information is needed for an accurate quotation?
A4: Please provide inner width, inner height, wall thickness, single pouring length, whether it is in-situ or precast, and structural drawings if available.
Send your utility tunnel cross-section drawings via the contact page and Lianggong's technical department will return a customized forming & shoring proposal with quantity, configuration and quotation.






