Wholesale Shoring Box Installation - Arch Installation Car – Lianggong
Wholesale Shoring Box Installation - Arch Installation Car – Lianggong Detail:
Product Details
The arch installation vehicle is composed of the automobile chassis, front and rear outriggers, sub-frame, sliding table, mechanical arm, working platform, manipulator, auxiliary arm, hydraulic hoist, etc. The structure is simple, the appearance is beautiful and the atmosphere, the driving speed of the car chassis can reach 80KM/H, the mobility is flexible, and the transition is convenient. One device can take into account multiple facets, reducing equipment investment, using the car chassis power when working, no external connection is required Power supply, fast equipment installation speed, equipped with two robotic arms, the maximum pitch angle of the robotic arm can reach 78 degrees, the telescopic stroke is 5m, and the overall forward and backward sliding distance can reach 3.9m. It can be quickly installed on the step arch.
Characteristics
Safety: Equipped with two robotic arms and two working platforms, workers are far away from the face of the hand, and the working environment is safer;
Manpower saving: only 4 people can complete the steel frame installation and steel mesh laying for one piece of equipment, saving 2-3 people;
Save money: the automobile chassis is flexible and flexible, one device can take care of multiple aspects, reducing equipment investment;
High efficiency: mechanized construction improves work efficiency, and it only takes 30-40 minutes to install a single arch, which speeds up the process cycle;
Two-step Construction Steps
1. Equipment in place
2. Ground connection arch
3. The right arm raises the first arch
4. Raise the left arm, the first arch
5. Aerial docking arch
6. Longitudinal ties
7. Raise the right arm, the second arch
8. Raise the left arm, the second arch
9. Aerial docking arch
10. Welded reinforcement and steel mesh
11. Leave the site quickly after construction
Three-step Construction Steps
1. Equipment in place
2. Install the side wall arch of the lower step
3. Install the middle step side wall arch
4. Install the top arch of the upper step
5. Leave the site quickly after construction
Product detail pictures:
Related Product Guide:
Our purpose would be to offer good quality products at competitive price ranges, and top-notch support to clients around the whole world. We're ISO9001, CE, and GS certified and strictly adhere to their good quality specifications for Wholesale Shoring Box Installation - Arch Installation Car – Lianggong , The product will supply to all over the world, such as: San Diego, Thailand, Belize, Ensuring high product quality by choosing the best suppliers, now we have also implemented complete quality control processes throughout our sourcing procedures. Meanwhile, our access to a large range of factories, coupled with our excellent management, also ensures that we can quickly fill your requirements at the best prices, regardless the order size.
The supplier abide the theory of "quality the basic, trust the first and management the advanced" so that they can ensure a reliable product quality and stable customers.




