Renewable Design for Bracket System - Protection Screen and Unloading Platform – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

Gaining purchaser gratification is our firm's intention eternally. We will make wonderful endeavours to build new and top-quality merchandise, satisfy your exclusive needs and provide you with pre-sale, on-sale and after-sale products and services for Construction Shutter Plywood, 6 Ft Scaffolding, Subway, We focus on creating own brand and in combination with many experienced term and first-class equipment . Our goods you worth have.
Renewable Design for Bracket System - Protection Screen and Unloading Platform – Lianggong Detail:

Product Details

Protection screen is a safety system in the construction of high-rise buildings. The system consists of rails and hydraulic lifting system and is able to climb by itself without crane. Protection screen has the entire pouring area enclosed, covering up three floors at the same time, which can more effectively avoid high air fall accidents and ensure the safety of the construction site. The system can be equipped with unloading platforms. The unloading platform is convenient for moving formwork and other materials to upper floors without disassembly.After pouring the slab, the formwork and scaffolding can be transported to the unloading platform, and then lifted by tower crane to the upper level for next step working, so that it greatly saves manpower and material resources and improves the construction speed.

The system has hydraulic system as its power, so it can climb up by itself. Cranes are not needed during the climbing. The unloading platform is convenient for moving formwork and other materials to upper floors without disassembly.

The protection screen is an advanced, state-of-the-art system which suits the demand for safety and civilization on site, and it indeed has been widely used in high-rise tower construction.

Further, the exterior armor plate of the protection screen is a good advertising board for publicity of the contractor.

Parameters

Working Pressure of Hydraulic System  50 KN
Number of Platform  0-5
Width of Operating Platform  900mm
Loading of the operating Platform  1-3KN/㎡
Loading of Unloading Platform  2 Tons
Protection Height  2.5 floors or 4.5 floors .

Major component

Hydraulic System

To power the system to climb up, cranes are not needed during the climbing.

Operating Platform

For assembling reinforcements, pouring concrete, stacking material etc.

Protection System

For enclosing all working area outer surface of the screen can be utilized to advertise

Unloading Platform

For Moving formwork and other material to upper floors.

Anchor System

For bearing the entire loading of the protection panel system, including operators and building materials.

Climbing Rail

for the Self-climbing of the protection panel system


2

Structure diagram


1


Product detail pictures:

Renewable Design for Bracket System - Protection Screen and Unloading Platform – Lianggong detail pictures

Renewable Design for Bracket System - Protection Screen and Unloading Platform – Lianggong detail pictures


Related Product Guide:

"Based on domestic market and expand overseas business" is our development strategy for Renewable Design for Bracket System - Protection Screen and Unloading Platform – Lianggong , The product will supply to all over the world, such as: Sri Lanka, Sheffield, Egypt, We set "be a creditable practitioner to achieve the continuous development and innovation" as our motto. We would like to share our experience with friends at home and abroad, as a way to create a bigger cake with our joint efforts. We have several experienced R & D persons and we welcome OEM orders.
  • Adhering to the business principle of mutual benefits, we have a happy and successful transaction, we think we will be the best business partner.
    5 Stars By Kristin from Macedonia - 2018.02.21 12:14
    After the signing of the contract, we received satisfactory goods in a short term, this is a commendable manufacturer.
    5 Stars By Maud from Casablanca - 2018.09.21 11:01
    Write your message here and send it to us