Reasonable price for Osha Trench Box Rules - Arch Installation Car – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

We insist on the principle of development of 'High quality, Efficiency, Sincerity and Down-to-earth working approach' to provide you with excellent service of processing for Poured Foundation Contractors, 2x4 Scaffolding, Pouring Concrete Slab, "Quality first, Price lowest, Service best" is the spirit of our company. We sincerely welcome you to visit our company and negotiate mutual business!
Reasonable price for Osha Trench Box Rules - Arch Installation Car – Lianggong Detail:

Product Details

The arch installation vehicle is composed of the automobile chassis, front and rear outriggers, sub-frame, sliding table, mechanical arm, working platform, manipulator, auxiliary arm, hydraulic hoist, etc. The structure is simple, the appearance is beautiful and the atmosphere, the driving speed of the car chassis can reach 80KM/H, the mobility is flexible, and the transition is convenient. One device can take into account multiple facets, reducing equipment investment, using the car chassis power when working, no external connection is required Power supply, fast equipment installation speed, equipped with two robotic arms, the maximum pitch angle of the robotic arm can reach 78 degrees, the telescopic stroke is 5m, and the overall forward and backward sliding distance can reach 3.9m. It can be quickly installed on the step arch.

Characteristics

Safety: Equipped with two robotic arms and two working platforms, workers are far away from the face of the hand, and the working environment is safer;

Manpower saving: only 4 people can complete the steel frame installation and steel mesh laying for one piece of equipment, saving 2-3 people;

Save money: the automobile chassis is flexible and flexible, one device can take care of multiple aspects, reducing equipment investment;

High efficiency: mechanized construction improves work efficiency, and it only takes 30-40 minutes to install a single arch, which speeds up the process cycle;

Two-step Construction Steps

1. Equipment in place

2. Ground connection arch

3. The right arm raises the first arch

4. Raise the left arm, the first arch

5. Aerial docking arch

6. Longitudinal ties

7. Raise the right arm, the second arch

8. Raise the left arm, the second arch

9. Aerial docking arch

10. Welded reinforcement and steel mesh

11. Leave the site quickly after construction

Three-step Construction Steps


2

1. Equipment in place

2. Install the side wall arch of the lower step

3. Install the middle step side wall arch

4. Install the top arch of the upper step

5. Leave the site quickly after construction


Product detail pictures:

Reasonable price for Osha Trench Box Rules - Arch Installation Car – Lianggong detail pictures


Related Product Guide:

We emphasize advancement and introduce new products into the market each year for Reasonable price for Osha Trench Box Rules - Arch Installation Car – Lianggong , The product will supply to all over the world, such as: Hamburg, Uganda, Swiss, Our company abides by the management idea of "keep innovation, pursue excellence". On the basis of assuring the advantages of existing products, we continuously strengthen and extend product development. Our company insists on innovation to promote the sustainable development of enterprise, and make us become the domestic high-quality suppliers.
  • High Quality, High Efficiency, Creative and Integrity, worth having long-term cooperation! Looking forward to the future cooperation!
    5 Stars By Annabelle from Portugal - 2017.08.28 16:02
    The company leader recept us warmly, through a meticulous and thorough discussion, we signed a purchase order. Hope to cooperate smoothly
    5 Stars By Karl from Philadelphia - 2018.11.22 12:28
    Write your message here and send it to us