Discount wholesale Hydrulic Tunnel Linning Trolley - Arch Installation Car – Lianggong
Discount wholesale Hydrulic Tunnel Linning Trolley - Arch Installation Car – Lianggong Detail:
Product Details
The arch installation vehicle is composed of the automobile chassis, front and rear outriggers, sub-frame, sliding table, mechanical arm, working platform, manipulator, auxiliary arm, hydraulic hoist, etc. The structure is simple, the appearance is beautiful and the atmosphere, the driving speed of the car chassis can reach 80KM/H, the mobility is flexible, and the transition is convenient. One device can take into account multiple facets, reducing equipment investment, using the car chassis power when working, no external connection is required Power supply, fast equipment installation speed, equipped with two robotic arms, the maximum pitch angle of the robotic arm can reach 78 degrees, the telescopic stroke is 5m, and the overall forward and backward sliding distance can reach 3.9m. It can be quickly installed on the step arch.
Characteristics
Safety: Equipped with two robotic arms and two working platforms, workers are far away from the face of the hand, and the working environment is safer;
Manpower saving: only 4 people can complete the steel frame installation and steel mesh laying for one piece of equipment, saving 2-3 people;
Save money: the automobile chassis is flexible and flexible, one device can take care of multiple aspects, reducing equipment investment;
High efficiency: mechanized construction improves work efficiency, and it only takes 30-40 minutes to install a single arch, which speeds up the process cycle;
Two-step Construction Steps
1. Equipment in place
2. Ground connection arch
3. The right arm raises the first arch
4. Raise the left arm, the first arch
5. Aerial docking arch
6. Longitudinal ties
7. Raise the right arm, the second arch
8. Raise the left arm, the second arch
9. Aerial docking arch
10. Welded reinforcement and steel mesh
11. Leave the site quickly after construction
Three-step Construction Steps
1. Equipment in place
2. Install the side wall arch of the lower step
3. Install the middle step side wall arch
4. Install the top arch of the upper step
5. Leave the site quickly after construction
Product detail pictures:
Related Product Guide:
Sticking to the principle of "Super Quality, Satisfactory service" ,We are striving to be a good business partner of you for Discount wholesale Hydrulic Tunnel Linning Trolley - Arch Installation Car – Lianggong , The product will supply to all over the world, such as: US, Juventus, Cyprus, After years' creating and developing, with the advantages of trained qualified talents and rich marketing experience, outstanding achievements were gradually made. We get good reputation from the customers due to our good solutions quality and fine after-sale service. We sincerely wish to create a more prosperous and flourishing future together with all the friends home and abroad!