Top Quality Concrete Formwork Cost - Plastic Column Formwork – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

We have our own sales team, design team, technical team, QC team and package team. We have strict quality control procedures for each process. Also, all of our workers are experienced in printing field for Pecafil Shuttering, Icf In Construction, Poured Walls, We believe that in good quality more than quantity. Before export of the hair there is strict top quality control check during treatment as per international good quality standards.
Top Quality Concrete Formwork Cost - Plastic Column Formwork – Lianggong Detail:

Product Details

By assembling of the three specifications,square column formwork would complete the square column structure in the side length from 200mm to 1000mm atintervals of 50mm.

1

15


1-36


1-210


1-112

Characteristics

* Light weight modular adjustable column panels made from plastic thus can be handled by manual

* Can produce columns with different sizes

* Save budget a great deal compared with other material formwork systems

* Easy erection by a simple 90 degree rotation of erection handle with smooth joints between panels

* Can work under in hot or cold areas

* Durable enough for repeat casting and can be recycled eventually

Product Advantages —— 4E

E1 Economic

A Labor-saving

Common workers can assemble EANTE formwork easily, so the labor cost will be reduced.

B Long cycle times:

Designed service life is 100 times, quality guarantee is 60 times, low average cost and high return rate.

C Accessories decreasing:

LG formwork has the higher strength with the designs of reinforcing rib and mixing glass fiber, so the more square timbers and steel tubes will be reduced in which to be used for reinforcing.

E2 Excellent

A. Good quality :

It has good strength and under the guidance of engineers, it can avoid swollen, deformed or burst mode and flawed

construction quality issues.

B. Good construction quality:

Good perpendicularity and flatness on the concrete surface(less than 5 mm).

C. Good concrete angle:

Good inner, outer and column angle, etc.

E3 Elastic

A. Light-weight:

Easy to carry(15kg/m²) and safe for handlin

B. Easy assembling:

Combined by connecting keys. No iron nail, chainsaw, and other products with potential risk.

C. High universality:

Complete formwork specifications, modular design, free combined and reassemble in the building site,

reconfiguration mode for new projects, no need to return for reprocessing

E4 Environmental

A. Clean and tidy:

The manufacturing and building sites are clean and in a good order.

B. Safe construction:

High strength and light-weight. Much less iron nails, iron wires or other dangerous issues.

C. High universality:

Strive for green manufacturing and green construction field.


Product detail pictures:

Top Quality Concrete Formwork Cost - Plastic Column Formwork – Lianggong detail pictures

Top Quality Concrete Formwork Cost - Plastic Column Formwork – Lianggong detail pictures


Related Product Guide:

We thinks what customers think, the urgency of urgency to act during the interests of a purchaser position of theory, allowing for much better good quality, lower processing costs, prices are extra reasonable, won the new and old buyers the support and affirmation for Top Quality Concrete Formwork Cost - Plastic Column Formwork – Lianggong , The product will supply to all over the world, such as: Jersey, Benin, kazan, With more and more Chinese products around the world, our international business is developing rapidly and economic indicators big increase year by year. We have enough confidence to offer you both better products and service, because we are more and more powerful, professional and experience in domestic and international.
  • This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By John biddlestone from Bogota - 2017.11.01 17:04
    The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
    5 Stars By Carey from Jordan - 2017.05.02 18:28
    Write your message here and send it to us