Special Price for Average Cost To Pour Concrete Slab - Precast Steel Formwork – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

We insist on offering high-quality production with great enterprise concept, honest product sales and also the finest and fast service. it will bring you not only the superior quality solution and huge profit, but the most significant should be to occupy the endless market for 20 Ft Scaffolding, Glulam Truss, Slip Form Formwork, Our intention should be to assist customers comprehend their goals. We have been creating terrific endeavours to obtain this win-win circumstance and sincerely welcome you to definitely join us!
Special Price for Average Cost To Pour Concrete Slab - Precast Steel Formwork – Lianggong Detail:

Product Details

Precast girder formwork has advantages of high-precision, simple structure,retractile,easy-demoulding and simple operation. It can be hoisted or dragged to casting site integrally, and demoulded integrally or piecemeal after concrete achieving the strength, then pull out the inner mould from the girder. It is handy installing and debugging, low labor intensity, and high efficient.

The bridge viaduct is divided into small segments, that are prefabricated in the good quality control casting yard, then, delivered to install by good erection equipment.

00

Key componets

1. Casting yard and segment production(geometry control program and software)

2. Segment erection/ installation and equipments

Segment casting yard components


1597374036(1)

1. Short-line match casting and casting mould units

2. Production and working space

  • rebar assembly

  • prestressing work

  • segment touch-up/ repair

  • ready-mixed concrete plant

3. Lifting equipments

4. Storage area

Characteristics

1. Construction Simplicity
• Easier installation of external post-tensioned tendons

2. Time Savings/Cost Effectiveness
• Precast segment to be prefabricated and stored at casting yard while foundation and sub-structure are being built.
• By using efficient erection method and equipment, the rapid installation of viaduct can be achieved.

3. Quality Control Q – A/QC
• Precast segment to be produced in factory-manner condition w/ good quality control.
• Minimum interruption natural impacts such as bad weather, rain.
• Minimum waste of material
• Good precision in production

4. Inspection and Maintenance
• External prestressing tendons can be easily inspected and repaired if required.
• Maintenance program can be scheduled.


_20200814110414


1597374006(1)

Packing

1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.

2. Different packages are used for different products:
—Bundles: timber beam, steel props, tie rod, etc.
—Pallet: small parts will be put in bags and then on pallets.
—Wooden cases: it is available on customer’s request.
—Bulk: some irregular goods will be loaded in bulk in container.

Delivery

1. Production: For full container, normally we need 20-30 days after receive customer’s down payment.

2. Transportation: It depends on the destination charge port.

3. Negotiation is needed for special requirements.


Product detail pictures:

Special Price for Average Cost To Pour Concrete Slab - Precast Steel Formwork – Lianggong detail pictures

Special Price for Average Cost To Pour Concrete Slab - Precast Steel Formwork – Lianggong detail pictures

Special Price for Average Cost To Pour Concrete Slab - Precast Steel Formwork – Lianggong detail pictures


Related Product Guide:

It adheres for the tenet "Honest, industrious, enterprising, innovative" to develop new products and solutions continuously. It regards shoppers, success as its individual success. Let us produce prosperous future hand in hand for Special Price for Average Cost To Pour Concrete Slab - Precast Steel Formwork – Lianggong , The product will supply to all over the world, such as: Washington, Mozambique, Estonia, As an experienced group we also accept customized order and make it same as your picture or sample specifying specification and customer design packing. The main goal of our company is to build up a satisfactory memory to all customers, and establish a long term win-win business relationship. Choose us, we always wait for your appearance!
  • Products and services are very good, our leader is very satisfied with this procurement, it is better than we expected,
    5 Stars By Evangeline from Russia - 2018.06.18 19:26
    It is a very good, very rare business partners, looking forward to the next more perfect cooperation!
    5 Stars By Dee Lopez from Miami - 2017.11.11 11:41
    Write your message here and send it to us