Short Lead Time for Scaffolding Concrete Formwork - Plastic Column Formwork – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

We're commitment to offer you the aggressive cost ,superb products and solutions top quality, too as fast delivery for 13.25 X 17 Stainless Steel Prop, Lay Concrete Slab, Harga Scaffolding, Sincerely hope we are growing up together with our prospects all over the environment.
Short Lead Time for Scaffolding Concrete Formwork - Plastic Column Formwork – Lianggong Detail:

Product Details

By assembling of the three specifications,square column formwork would complete the square column structure in the side length from 200mm to 1000mm atintervals of 50mm.

1

15


1-36


1-210


1-112

Characteristics

* Light weight modular adjustable column panels made from plastic thus can be handled by manual

* Can produce columns with different sizes

* Save budget a great deal compared with other material formwork systems

* Easy erection by a simple 90 degree rotation of erection handle with smooth joints between panels

* Can work under in hot or cold areas

* Durable enough for repeat casting and can be recycled eventually

Product Advantages —— 4E

E1 Economic

A Labor-saving

Common workers can assemble EANTE formwork easily, so the labor cost will be reduced.

B Long cycle times:

Designed service life is 100 times, quality guarantee is 60 times, low average cost and high return rate.

C Accessories decreasing:

LG formwork has the higher strength with the designs of reinforcing rib and mixing glass fiber, so the more square timbers and steel tubes will be reduced in which to be used for reinforcing.

E2 Excellent

A. Good quality :

It has good strength and under the guidance of engineers, it can avoid swollen, deformed or burst mode and flawed

construction quality issues.

B. Good construction quality:

Good perpendicularity and flatness on the concrete surface(less than 5 mm).

C. Good concrete angle:

Good inner, outer and column angle, etc.

E3 Elastic

A. Light-weight:

Easy to carry(15kg/m²) and safe for handlin

B. Easy assembling:

Combined by connecting keys. No iron nail, chainsaw, and other products with potential risk.

C. High universality:

Complete formwork specifications, modular design, free combined and reassemble in the building site,

reconfiguration mode for new projects, no need to return for reprocessing

E4 Environmental

A. Clean and tidy:

The manufacturing and building sites are clean and in a good order.

B. Safe construction:

High strength and light-weight. Much less iron nails, iron wires or other dangerous issues.

C. High universality:

Strive for green manufacturing and green construction field.


Product detail pictures:

Short Lead Time for Scaffolding Concrete Formwork - Plastic Column Formwork – Lianggong detail pictures

Short Lead Time for Scaffolding Concrete Formwork - Plastic Column Formwork – Lianggong detail pictures


Related Product Guide:

Our commission should be to provide our end users and clients with very best excellent and aggressive portable digital products and solutions for Short Lead Time for Scaffolding Concrete Formwork - Plastic Column Formwork – Lianggong , The product will supply to all over the world, such as: Saudi Arabia, Malta, Rwanda, Strict quality control is executed in each link of the whole production process.We sincerely hope to establish the friendly and mutual-beneficial cooperation with you. Based on high quality products and perfect pre-sales /after-sales service is our idea, some clients had cooperated with us for more than 5 years.
  • Speaking of this cooperation with the Chinese manufacturer, I just want to say"well dodne", we are very satisfied.
    5 Stars By Miriam from Lyon - 2018.12.28 15:18
    We have been engaged in this industry for many years, we appreciate the work attitude and production capacity of the company, this is a reputable and professional manufacturer.
    5 Stars By Jean from Atlanta - 2018.02.08 16:45
    Write your message here and send it to us