Short Lead Time for 6×10 Wood Beam - H20 Timber Beam Column Formwork – Lianggong
Short Lead Time for 6×10 Wood Beam - H20 Timber Beam Column Formwork – Lianggong Detail:
Product Details
The timber beam column formwork is mainly used for casting columns, and its structure and connecting way are quite similar to that of wall formwork.High flexibility with only a few main components can meet any construction requirements, such as timber beam H20, steel waling, plywood and clamp etc.
Material | Q235 Steel, Timber Beam, Plywood |
Color | Customized Or Yellow,Blue,Brown |
Size | Universal Forming |
Technical Specification
Max. permissable pressure is 80kN/m2
Easy to take any fresh concrete pressure by adjusting layout space between H20 and walers
Max.Cross section is 1.0mx1.0m without in-through tie rod
Flexible adjustment to fit different column dimension
Timber beam adjustable column formwork
The adjustable column formwork enables concrete casting of square or rectangular columns within a specific range by adjusting the size of the formwork section area. The adjustment is realized by changing the relative position of the walers.
There are three specifications for the walers of adjustable column formwork, which can do concrete casting of square or rectangular columns with side length of 200-1400mm. Sizes of column to be casted as follows:
Length of waler (m) |
Scope of side length of column to be casted (m) |
1.6 and 1.9 |
1.0 ~ 1.4 |
1.6 and 1.3 |
0.6 ~ 1.0 |
1.3 and 0.9 |
0.2 ~ 0.6 |
It can be adjusted to any cross-section size within the allowable range, both square and rectangular. The schematic diagram of adjustment is as follows:
Wall diagonal brace
The timber beam wall column formwork needs to be equipped with a spindle strut, which is used as an adjusting system as shown in the figure:
Application
Our Service
Provide support in every stage of projects
1. Provide cosult when client take part in projects bid invitation.
2. Provide optimized formwork tender solution to assitant client to win the project.
3. Developing formwork design, refining initial plan, and exploring relation limit between supply&demand.
4. Start to design the formwork detailedly according to the winning bidding.
5. Provide economic formwork solution package and provide continous on-site support service.
Packing
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
—bundles: timber beam, steel props, tie rod, etc.
—pallet: small parts will be put in bags and then on pallets.
—wooden cases: it is available on customer’s request.
—bulk: some irregular goods will be loaded in bulk in container.
Delivery
1. Production: For full container, normally we need 20-30 days after receive customer’s down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Product detail pictures:




Related Product Guide:
Bear "Customer first, Excellent first" in mind, we operate closely with our customers and supply them with efficient and expert services for Short Lead Time for 6×10 Wood Beam - H20 Timber Beam Column Formwork – Lianggong , The product will supply to all over the world, such as: kazakhstan, Gambia, Bulgaria, As a way to make use of the resource on the expanding information and facts in international trade, we welcome prospects from everywhere on the web and offline. In spite in the top quality products we offer, effective and satisfying consultation service is supplied by our specialist after-sale service group. Solution lists and detailed parameters and any other info weil be sent to you timely for the inquiries. So please get in touch with us by sending us emails or contact us if you have any concerns about our firm. ou can also get our address info from our web site and come to our enterprise. or a field survey of our solutions. We're confident that we are going to share mutual results and build solid co-operation relations with our companions in this market. We're looking forward to your inquiries.

Staff is skilled, well-equipped, process is specification, products meet the requirements and delivery is guaranteed, a best partner!
