Quality Inspection for Pouring Concrete Footings - Precast Steel Formwork – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

We are convinced that with joint efforts, the business between us will bring us mutual benefits. We can assure you product quality and competitive price for 6 foot scaffolding, PP Formwork, Roda Scaffolding, We are sincerely on the lookout ahead to cooperate with buyers everywhere in the entire world. We imagine we will satisfy along with you. We also warmly welcome consumers to visit our manufacturing unit and purchase our items.
Quality Inspection for Pouring Concrete Footings - Precast Steel Formwork – Lianggong Detail:

Product Details

Precast girder formwork has advantages of high-precision, simple structure,retractile,easy-demoulding and simple operation. It can be hoisted or dragged to casting site integrally, and demoulded integrally or piecemeal after concrete achieving the strength, then pull out the inner mould from the girder. It is handy installing and debugging, low labor intensity, and high efficient.

The bridge viaduct is divided into small segments, that are prefabricated in the good quality control casting yard, then, delivered to install by good erection equipment.

00

Key componets

1. Casting yard and segment production(geometry control program and software)

2. Segment erection/ installation and equipments

Segment casting yard components


1597374036(1)

1. Short-line match casting and casting mould units

2. Production and working space

  • rebar assembly

  • prestressing work

  • segment touch-up/ repair

  • ready-mixed concrete plant

3. Lifting equipments

4. Storage area

Characteristics

1. Construction Simplicity
• Easier installation of external post-tensioned tendons

2. Time Savings/Cost Effectiveness
• Precast segment to be prefabricated and stored at casting yard while foundation and sub-structure are being built.
• By using efficient erection method and equipment, the rapid installation of viaduct can be achieved.

3. Quality Control Q – A/QC
• Precast segment to be produced in factory-manner condition w/ good quality control.
• Minimum interruption natural impacts such as bad weather, rain.
• Minimum waste of material
• Good precision in production

4. Inspection and Maintenance
• External prestressing tendons can be easily inspected and repaired if required.
• Maintenance program can be scheduled.


_20200814110414


1597374006(1)

Packing

1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.

2. Different packages are used for different products:
—Bundles: timber beam, steel props, tie rod, etc.
—Pallet: small parts will be put in bags and then on pallets.
—Wooden cases: it is available on customer’s request.
—Bulk: some irregular goods will be loaded in bulk in container.

Delivery

1. Production: For full container, normally we need 20-30 days after receive customer’s down payment.

2. Transportation: It depends on the destination charge port.

3. Negotiation is needed for special requirements.


Product detail pictures:

Quality Inspection for Pouring Concrete Footings - Precast Steel Formwork – Lianggong detail pictures

Quality Inspection for Pouring Concrete Footings - Precast Steel Formwork – Lianggong detail pictures

Quality Inspection for Pouring Concrete Footings - Precast Steel Formwork – Lianggong detail pictures


Related Product Guide:

Our items are commonly identified and trusted by people and can fulfill repeatedly altering economic and social wants of Quality Inspection for Pouring Concrete Footings - Precast Steel Formwork – Lianggong , The product will supply to all over the world, such as: Hungary, Swiss, Iran, We believe that good business relationships will lead to mutual benefits and improvement for both parties. We now have established long-term and successful cooperative relationships with many customers through their confidence in our customized services and integrity in doing business. We also enjoy a high reputation through our good performance. Better performance will be expected as our principle of integrity. Devotion and Steadiness will remain as ever.
  • Products and services are very good, our leader is very satisfied with this procurement, it is better than we expected,
    5 Stars By Yannick Vergoz from Somalia - 2018.06.19 10:42
    Managers are visionary, they have the idea of "mutual benefits, continuous improvement and innovation", we have a pleasant conversation and Cooperation.
    5 Stars By Martin Tesch from New Zealand - 2017.09.29 11:19
    Write your message here and send it to us