PriceList for Removing Track Rod End - Tie Rod – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

We know that we only thrive if we can guarantee our combined price competiveness and quality advantageous at the same time for Glulam Posts, Performance Tie Rod Ends, Osha 1926.451, Please feel free to contact us at any time. We will reply you when we receive your inquiries. Please note that samples are available before we start our business.
PriceList for Removing Track Rod End - Tie Rod – Lianggong Detail:

Product Details

Formwork tie rod performs as the most important member in tie rod system, fastening formwork panels. Usually used together with wing nut, waler plate, water stop, etc. Also it is enbeded in concrete used as lost part.

Tie rods are often used in steel structures, such as bridges, industrial buildings, tanks, towers, and cranes. In ships, tie rods are bolts which keep the whole engine structure under compression. They provide for fatigue strength. They also provide for proper running gear alignment which prevents fretting.

Concrete formwork tie rod can be in cold rolled and hot rolled.

Cold rolled tie rod is in steel grade S235 and S450.

Hot rolled tie rod is also called rebar in steel grade ST500 -1100. Hot rolled rebar popular steel grade is in ST 830, ST 930 ST1100 in concrete construction.

Formwork tie rod are used together with formwork tie nuts include anchor flange nut, wing nut with base plate, water stopper barriers, wedge clamp, Hex Nut, dome nut etc. Inner thread of the tie nuts must be matched up with the tie rod size thread screw.

The formwork tie rod size can be in D12-D50mm. The most popular size of tie rod no matter cold rolled or hot rolled, is in D15, D16, D17, D20, D22mm for construction slab, wall and beams

Formwork tie rod length is always in customized from 1m to 12mtr.

Concrete formwork tie rod can be in black or zinc-plated(whilte or yellow golden color) from wellmade scaffold, China leading OEM scaffolding formwork manufacturer, ISO&CE, 50,000m2 auto to 49 countries.

Lianggong formwork tie rod is one of the most important accessories in pouring shear wall project. Together with Lianggong big plate nut, concrete formwork tie rod and big plate nut act as wall tie system, to fasten the formwork panels tightly during concrete pouring process.  

Packing


3


4

Application


1 (1)


1 (3)


1 (4)


1 (2)


Product detail pictures:

PriceList for Removing Track Rod End - Tie Rod – Lianggong detail pictures

PriceList for Removing Track Rod End - Tie Rod – Lianggong detail pictures

PriceList for Removing Track Rod End - Tie Rod – Lianggong detail pictures

PriceList for Removing Track Rod End - Tie Rod – Lianggong detail pictures


Related Product Guide:

Sticking to the belief of "Creating products of high quality and making friends with people from all over the world", we always put the interest of customers in the first place for PriceList for Removing Track Rod End - Tie Rod – Lianggong , The product will supply to all over the world, such as: Peru, Cologne, Swansea, With a wide range, good quality, reasonable prices and stylish designs, our products are extensively used in beauty and other industries. Our products are widely recognized and trusted by users and can meet continuously changing economic and social needs.
  • We have been cooperated with this company for many years, the company always ensure timely delivery ,good quality and correct number, we are good partners.
    5 Stars By Christopher Mabey from Atlanta - 2017.07.07 13:00
    Product variety is complete, good quality and inexpensive, the delivery is fast and transport is security, very good, we are happy to cooperate with a reputable company!
    5 Stars By Bertha from Switzerland - 2017.10.13 10:47
    Write your message here and send it to us