OEM Supply Cost To Pour Cement Slab - Precast Steel Formwork – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

Gaining purchaser gratification is our company's aim eternally. We're going to make great initiatives to create new and top-quality products, satisfy your exclusive prerequisites and supply you with pre-sale, on-sale and after-sale solutions for Pouring Concrete In A Pole Barn, Pouring Concrete On Dirt, Small Scaffold Tower, We are hunting ahead to building positive and beneficial links with the businesses round the globe. We warmly welcome you to definitely call us to begin discussions on how we can easily bring this into being.
OEM Supply Cost To Pour Cement Slab - Precast Steel Formwork – Lianggong Detail:

Product Details

Precast girder formwork has advantages of high-precision, simple structure, retractile, easy-demoulding and simple operation. It can be hoisted or dragged to casting site integrally, and demoulded integrally or piecemeal after concrete achieving the strength, then pull out the inner mould from the girder. It is handy installing and debugging, low labor intensity, and high efficient.

The bridge viaduct is divided into small segments, that are prefabricated in the good quality control casting yard, then, delivered to install by good erection equipment.

00

Key componets

1. Casting yard and segment production(geometry control program and software).

2. Segment erection/ installation and equipments.

Segment casting yard components


1597374036(1)

1. Short-line match casting and casting mould units

2. Production and working space

  • rebar assembly

  • prestressing work

  • segment touch-up/repair

  • ready-mixed concrete plant

3. Lifting equipments

4. Storage area

Characteristics

1. Construction Simplicity
• Easier installation of external post-tensioned tendons

2. Time Savings/Cost Effectiveness
• Precast segment to be prefabricated and stored at casting yard while foundation and sub-structure are being built.
• By using efficient erection method and equipment, the rapid installation of viaduct can be achieved.

3. Quality Control Q – A/QC
• Precast segment to be produced in factory-manner condition w/good quality control.
• Minimum interruption natural impacts such as bad weather, rain.
• Minimum waste of material
• Good precision in production

4. Inspection and Maintenance
• External prestressing tendons can be easily inspected and repaired if required.
• Maintenance program can be scheduled.


_20200814110414


1597374006(1)

Packing

1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.

2. Different packages are used for different products:
—Bundles: timber beam, steel props, tie rod, etc.
—Pallet: small parts will be put in bags and then on pallets.
—Wooden cases: it is available on customer’s request.
—Bulk: some irregular goods will be loaded in bulk in container.

Delivery

1. Production: For full container, normally we need 20-30 days after receive customer’s down payment.

2. Transportation: It depends on the destination charge port.

3. Negotiation is needed for special requirements.


Product detail pictures:

OEM Supply Cost To Pour Cement Slab - Precast Steel Formwork – Lianggong detail pictures

OEM Supply Cost To Pour Cement Slab - Precast Steel Formwork – Lianggong detail pictures

OEM Supply Cost To Pour Cement Slab - Precast Steel Formwork – Lianggong detail pictures


Related Product Guide:

"Based on domestic market and expand overseas business" is our development strategy for OEM Supply Cost To Pour Cement Slab - Precast Steel Formwork – Lianggong , The product will supply to all over the world, such as: Kazakhstan, Florida, Swedish, Merchandise have been exported to Asia, Mid-east,European and Germany market. Our company has constantly been able to update the items performance and safety to meet the markets and strive to be top A on stable quality and sincere service. If you have the honor to do business with our company. we'll undoubtedly do our very best to support your business in China.
  • Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
    5 Stars By Elaine from Portugal - 2017.09.22 11:32
    Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
    5 Stars By Madeline from Karachi - 2017.09.26 12:12
    Write your message here and send it to us