Massive Selection for 3000 Sq Ft Concrete Slab Cost - Precast Steel Formwork – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

We believe that long term partnership is a result of high quality, value added service, rich experience and personal contact for Timber beam in middle-east, In And Out Tie Rod, Slab House Cost, Our ultimate goal is to rank as a top brand and to lead as a pioneer in our field. We are sure our successful experience in tool production will win customer's trust, Wish to co-operate and co-create a better future with you!
Massive Selection for 3000 Sq Ft Concrete Slab Cost - Precast Steel Formwork – Lianggong Detail:

Product Details

Precast girder formwork has advantages of high-precision, simple structure,retractile,easy-demoulding and simple operation. It can be hoisted or dragged to casting site integrally, and demoulded integrally or piecemeal after concrete achieving the strength, then pull out the inner mould from the girder. It is handy installing and debugging, low labor intensity, and high efficient.

The bridge viaduct is divided into small segments, that are prefabricated in the good quality control casting yard, then, delivered to install by good erection equipment.

00

Key componets

1. Casting yard and segment production(geometry control program and software)

2. Segment erection/ installation and equipments

Segment casting yard components


1597374036(1)

1. Short-line match casting and casting mould units

2. Production and working space

  • rebar assembly

  • prestressing work

  • segment touch-up/ repair

  • ready-mixed concrete plant

3. Lifting equipments

4. Storage area

Characteristics

1. Construction Simplicity
• Easier installation of external post-tensioned tendons

2. Time Savings/Cost Effectiveness
• Precast segment to be prefabricated and stored at casting yard while foundation and sub-structure are being built.
• By using efficient erection method and equipment, the rapid installation of viaduct can be achieved.

3. Quality Control Q – A/QC
• Precast segment to be produced in factory-manner condition w/ good quality control.
• Minimum interruption natural impacts such as bad weather, rain.
• Minimum waste of material
• Good precision in production

4. Inspection and Maintenance
• External prestressing tendons can be easily inspected and repaired if required.
• Maintenance program can be scheduled.


_20200814110414


1597374006(1)

Packing

1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.

2. Different packages are used for different products:
—Bundles: timber beam, steel props, tie rod, etc.
—Pallet: small parts will be put in bags and then on pallets.
—Wooden cases: it is available on customer’s request.
—Bulk: some irregular goods will be loaded in bulk in container.

Delivery

1. Production: For full container, normally we need 20-30 days after receive customer’s down payment.

2. Transportation: It depends on the destination charge port.

3. Negotiation is needed for special requirements.


Product detail pictures:

Massive Selection for 3000 Sq Ft Concrete Slab Cost - Precast Steel Formwork – Lianggong detail pictures

Massive Selection for 3000 Sq Ft Concrete Slab Cost - Precast Steel Formwork – Lianggong detail pictures

Massive Selection for 3000 Sq Ft Concrete Slab Cost - Precast Steel Formwork – Lianggong detail pictures


Related Product Guide:

Our pros are lessen prices,dynamic sales team,specialised QC,sturdy factories,top quality services and products for Massive Selection for 3000 Sq Ft Concrete Slab Cost - Precast Steel Formwork – Lianggong , The product will supply to all over the world, such as: Chile, America, Turin, Since the establishment of our company, we've realized the importance of providing good quality goods and the best before-sales and after-sales services. Most problems between global suppliers and clients are due to poor communication. Culturally, suppliers can be reluctant to question points they do not understand. We break down these barriers to ensure you get what you want to the level you expect, when you want it.
  • Problems can be quickly and effectively resolved, it is worth to be trust and working together.
    5 Stars By Grace from Swaziland - 2018.11.11 19:52
    The customer service staff's attitude is very sincere and the reply is timely and very detailed, this is very helpful for our deal,thank you.
    5 Stars By John biddlestone from Juventus - 2017.09.22 11:32
    Write your message here and send it to us