Manufacturing Companies for Cost To Pour Concrete Steps - Precast Steel Formwork – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

Fast and great quotations, informed advisers to help you choose the correct solution that suits all your requirements, a short creation time, responsible top quality manage and distinct providers for paying and shipping affairs for Magnetic Formwork, Exterior Wood Beams, Concrete Slab Cost, Our company maintains safe business mixed by truth and honesty to keep long-term relationships with our customers.
Manufacturing Companies for Cost To Pour Concrete Steps - Precast Steel Formwork – Lianggong Detail:

Product Details

Precast girder formwork has advantages of high-precision, simple structure,retractile,easy-demoulding and simple operation. It can be hoisted or dragged to casting site integrally, and demoulded integrally or piecemeal after concrete achieving the strength, then pull out the inner mould from the girder. It is handy installing and debugging, low labor intensity, and high efficient.

The bridge viaduct is divided into small segments, that are prefabricated in the good quality control casting yard, then, delivered to install by good erection equipment.

00

Key componets

1. Casting yard and segment production(geometry control program and software)

2. Segment erection/ installation and equipments

Segment casting yard components


1597374036(1)

1. Short-line match casting and casting mould units

2. Production and working space

  • rebar assembly

  • prestressing work

  • segment touch-up/ repair

  • ready-mixed concrete plant

3. Lifting equipments

4. Storage area

Characteristics

1. Construction Simplicity
• Easier installation of external post-tensioned tendons

2. Time Savings/Cost Effectiveness
• Precast segment to be prefabricated and stored at casting yard while foundation and sub-structure are being built.
• By using efficient erection method and equipment, the rapid installation of viaduct can be achieved.

3. Quality Control Q – A/QC
• Precast segment to be produced in factory-manner condition w/ good quality control.
• Minimum interruption natural impacts such as bad weather, rain.
• Minimum waste of material
• Good precision in production

4. Inspection and Maintenance
• External prestressing tendons can be easily inspected and repaired if required.
• Maintenance program can be scheduled.


_20200814110414


1597374006(1)

Packing

1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.

2. Different packages are used for different products:
—Bundles: timber beam, steel props, tie rod, etc.
—Pallet: small parts will be put in bags and then on pallets.
—Wooden cases: it is available on customer’s request.
—Bulk: some irregular goods will be loaded in bulk in container.

Delivery

1. Production: For full container, normally we need 20-30 days after receive customer’s down payment.

2. Transportation: It depends on the destination charge port.

3. Negotiation is needed for special requirements.


Product detail pictures:

Manufacturing Companies for Cost To Pour Concrete Steps - Precast Steel Formwork – Lianggong detail pictures

Manufacturing Companies for Cost To Pour Concrete Steps - Precast Steel Formwork – Lianggong detail pictures

Manufacturing Companies for Cost To Pour Concrete Steps - Precast Steel Formwork – Lianggong detail pictures


Related Product Guide:

Our merchandise are commonly identified and dependable by end users and will meet continually altering financial and social desires for Manufacturing Companies for Cost To Pour Concrete Steps - Precast Steel Formwork – Lianggong , The product will supply to all over the world, such as: Estonia, Jamaica, Oslo, To make every client satisfied with us and achieve win-win success, we will continue to try our best to serve and satisfy you! Sincerely looking forward to cooperating with more overseas customers based on mutual benefits and great future business. Thank you.
  • Superb technology, perfect after-sales service and efficient work efficiency, we think this is our best choice.
    5 Stars By Eric from Zambia - 2018.09.29 17:23
    The company has rich resources, advanced machinery, experienced workers and excellent services, hope you keep improving and perfecting your products and service, wish you better!
    5 Stars By Eden from Malawi - 2017.10.27 12:12
    Write your message here and send it to us