Hot-selling Trench Box Pins - Arch Installation Car – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

We also present product or service sourcing and flight consolidation products and services. We have our possess manufacturing facility and sourcing place of work. We can easily supply you with almost every type of product or service connected to our item variety for Shoring, Jumping Formwork, pp hollow construction formwork, We warmly welcome friends from all walks of life to cooperate with us.
Hot-selling Trench Box Pins - Arch Installation Car – Lianggong Detail:

Product Details

The arch installation vehicle is composed of the automobile chassis, front and rear outriggers, sub-frame, sliding table, mechanical arm, working platform, manipulator, auxiliary arm, hydraulic hoist, etc. The structure is simple, the appearance is beautiful and the atmosphere, the driving speed of the car chassis can reach 80KM/H, the mobility is flexible, and the transition is convenient. One device can take into account multiple facets, reducing equipment investment, using the car chassis power when working, no external connection is required Power supply, fast equipment installation speed, equipped with two robotic arms, the maximum pitch angle of the robotic arm can reach 78 degrees, the telescopic stroke is 5m, and the overall forward and backward sliding distance can reach 3.9m. It can be quickly installed on the step arch.

Characteristics

Safety: Equipped with two robotic arms and two working platforms, workers are far away from the face of the hand, and the working environment is safer;

Manpower saving: only 4 people can complete the steel frame installation and steel mesh laying for one piece of equipment, saving 2-3 people;

Save money: the automobile chassis is flexible and flexible, one device can take care of multiple aspects, reducing equipment investment;

High efficiency: mechanized construction improves work efficiency, and it only takes 30-40 minutes to install a single arch, which speeds up the process cycle;

Two-step Construction Steps

1. Equipment in place

2. Ground connection arch

3. The right arm raises the first arch

4. Raise the left arm, the first arch

5. Aerial docking arch

6. Longitudinal ties

7. Raise the right arm, the second arch

8. Raise the left arm, the second arch

9. Aerial docking arch

10. Welded reinforcement and steel mesh

11. Leave the site quickly after construction

Three-step Construction Steps


2

1. Equipment in place

2. Install the side wall arch of the lower step

3. Install the middle step side wall arch

4. Install the top arch of the upper step

5. Leave the site quickly after construction


Product detail pictures:

Hot-selling Trench Box Pins - Arch Installation Car – Lianggong detail pictures


Related Product Guide:

continue to improve, to ensure product quality in line with market and customer standard requirements. Our company has a quality assurance system have been established for Hot-selling Trench Box Pins - Arch Installation Car – Lianggong , The product will supply to all over the world, such as: Lyon, America, Karachi, Our company has abundant strength and possesses a steady and perfect sales network system. We wish we could establish sound business relationships with all customers from at home and abroad on the basis of mutual benefits.
  • Customer service staff and sales man are very patience and they all good at English, product's arrival is also very timely, a good supplier.
    5 Stars By Elvira from Lahore - 2018.11.04 10:32
    The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
    5 Stars By Honey from Naples - 2018.12.28 15:18
    Write your message here and send it to us