High Quality Tunnel Form System - Rock Drill – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

We always think and practice corresponding to the change of circumstance, and grow up. We aim at the achievement of a richer mind and body and the living for Scaffold Tube Connectors, Tripod Scaffolding, Scaffold Stairs, We sincerely welcome pals to negotiate enterprise and start cooperation. We hope to join hands with pals in different industries to produce a outstanding foreseeable future.
High Quality Tunnel Form System - Rock Drill – Lianggong Detail:

Product Details

In recent years, as construction units attach great importance to project safety, quality, and construction period, traditional drilling and excavation methods have been unable to meet construction requirements.

Characteristics

The fully computerized three-arm rock drill produced by our company has the advantages of reducing labor intensity of workers, improving the working environment, improving construction efficiency, and reducing the skill dependence of operators. It is a breakthrough in the field of tunnel mechanization construction. It is suitable for the excavation and construction of tunnels and tunnels on highways, railways, water conservancy and hydropower construction sites. It can automatically complete the positioning, drilling, feedback, and adjustment functions of blasting holes, bolt holes, and grouting holes. It can also be used for charging and installation High-altitude operations such as bolting, grouting, and installation of air ducts.

Working Progress

1. The software draws the planning diagram of drilling parameters and imports it into the computer via a mobile storage device
2. The equipment is in place and the support legs
3. Total station positioning measurement
4. Input the measurement results into the on-board computer to determine the relative position of the whole machine in the tunnel
5. Choose manual, semi-automatic and full-automatic mode according to the current situation of the face

Advantages

(1) High precision:
Accurately control the angle of the propelling beam and the depth of the hole, and the amount of over-excavation is small;
(2) Easy operation
Only 3 people are required to operate a piece of equipment, and the workers are far away from the face, making the construction safer;
(3) High-efficiency
The single hole drilling speed is fast, which improves the construction progress;
(4) High-quality fittings
The rock drill, main hydraulic components and chassis transmission system are all imported well-known brands;
(5) Humanized design
Enclosed cab with humanized design to reduce noise and dust damage.

4


Product detail pictures:

High Quality Tunnel Form System - Rock Drill – Lianggong detail pictures


Related Product Guide:

The key to our success is "Good Product Quality, Reasonable Price and Efficient Service" for High Quality Tunnel Form System - Rock Drill – Lianggong , The product will supply to all over the world, such as: French, Mozambique, California, The products has a good reputation with competitive price, unique creation, leading the industry trends. The company insists on the principle of win-win idea, has establishedglobal sales network and after-sales service network.
  • Products and services are very good, our leader is very satisfied with this procurement, it is better than we expected,
    5 Stars By Penelope from Georgia - 2018.11.04 10:32
    It can be said that this is a best producer we encountered in China in this industry, we feel lucky to work with so excellent manufacturer.
    5 Stars By Gail from Angola - 2018.10.01 14:14
    Write your message here and send it to us