Factory directly supply Kundel Trench Box - Arch Installation Car – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

We have the most advanced production equipment, experienced and qualified engineers and workers, recognized quality control systems and a friendly professional sales team pre/after-sales support for Groundforce Trench Box, 6 foot scaffolding, Osha 1926.451, We have now ISO 9001 Certification and qualified this item .in excess of 16 years experiences in manufacturing and designing, so our items featured with best quality and competitive selling price. Welcome cooperation with us!
Factory directly supply Kundel Trench Box - Arch Installation Car – Lianggong Detail:

Product Details

The arch installation vehicle is composed of the automobile chassis, front and rear outriggers, sub-frame, sliding table, mechanical arm, working platform, manipulator, auxiliary arm, hydraulic hoist, etc. The structure is simple, the appearance is beautiful and the atmosphere, the driving speed of the car chassis can reach 80KM/H, the mobility is flexible, and the transition is convenient. One device can take into account multiple facets, reducing equipment investment, using the car chassis power when working, no external connection is required Power supply, fast equipment installation speed, equipped with two robotic arms, the maximum pitch angle of the robotic arm can reach 78 degrees, the telescopic stroke is 5m, and the overall forward and backward sliding distance can reach 3.9m. It can be quickly installed on the step arch.

Characteristics

Safety: Equipped with two robotic arms and two working platforms, workers are far away from the face of the hand, and the working environment is safer;

Manpower saving: only 4 people can complete the steel frame installation and steel mesh laying for one piece of equipment, saving 2-3 people;

Save money: the automobile chassis is flexible and flexible, one device can take care of multiple aspects, reducing equipment investment;

High efficiency: mechanized construction improves work efficiency, and it only takes 30-40 minutes to install a single arch, which speeds up the process cycle;

Two-step Construction Steps

1. Equipment in place

2. Ground connection arch

3. The right arm raises the first arch

4. Raise the left arm, the first arch

5. Aerial docking arch

6. Longitudinal ties

7. Raise the right arm, the second arch

8. Raise the left arm, the second arch

9. Aerial docking arch

10. Welded reinforcement and steel mesh

11. Leave the site quickly after construction

Three-step Construction Steps


2

1. Equipment in place

2. Install the side wall arch of the lower step

3. Install the middle step side wall arch

4. Install the top arch of the upper step

5. Leave the site quickly after construction


Product detail pictures:

Factory directly supply Kundel Trench Box - Arch Installation Car – Lianggong detail pictures


Related Product Guide:

We continue to keep increasing and perfecting our solutions and service. At the same time, we operate actively to do research and enhancement for Factory directly supply Kundel Trench Box - Arch Installation Car – Lianggong , The product will supply to all over the world, such as: Austria, Nepal, Birmingham, We've been persisting in the business essence "Quality First, Honoring Contracts and Standing by Reputations, providing customers with satisfying products and service. " Friends both at home and abroad are warmly welcome to establish everlasting business relations with us.
  • Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
    5 Stars By Harriet from Netherlands - 2018.12.11 14:13
    We have been cooperated with this company for many years, the company always ensure timely delivery ,good quality and correct number, we are good partners.
    5 Stars By Stephen from Myanmar - 2017.06.16 18:23
    Write your message here and send it to us