Discountable price Driveworks Tie Rod End - Tie Rod – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

We emphasize enhancement and introduce new solutions into the market just about every year for Concrete Boxing Formwork, Shuttering Timber For Concrete, Scaffold Brackets For Walls, Our intention should be to assist customers comprehend their goals. We have been creating terrific endeavours to obtain this win-win circumstance and sincerely welcome you to definitely join us!
Discountable price Driveworks Tie Rod End - Tie Rod – Lianggong Detail:

Product Details

Formwork tie rod performs as the most important member in tie rod system, fastening formwork panels. Usually used together with wing nut, waler plate, water stop, etc. Also it is enbeded in concrete used as lost part.

Tie rods are often used in steel structures, such as bridges, industrial buildings, tanks, towers, and cranes. In ships, tie rods are bolts which keep the whole engine structure under compression. They provide for fatigue strength. They also provide for proper running gear alignment which prevents fretting.

Concrete formwork tie rod can be in cold rolled and hot rolled.

Cold rolled tie rod is in steel grade S235 and S450.

Hot rolled tie rod is also called rebar in steel grade ST500 -1100. Hot rolled rebar popular steel grade is in ST 830, ST 930 ST1100 in concrete construction.

Formwork tie rod are used together with formwork tie nuts include anchor flange nut, wing nut with base plate, water stopper barriers, wedge clamp, Hex Nut, dome nut etc. Inner thread of the tie nuts must be matched up with the tie rod size thread screw.

The formwork tie rod size can be in D12-D50mm. The most popular size of tie rod no matter cold rolled or hot rolled, is in D15, D16, D17, D20, D22mm for construction slab, wall and beams

Formwork tie rod length is always in customized from 1m to 12mtr.

Concrete formwork tie rod can be in black or zinc-plated(whilte or yellow golden color) from wellmade scaffold, China leading OEM scaffolding formwork manufacturer, ISO&CE, 50,000m2 auto to 49 countries.

Lianggong formwork tie rod is one of the most important accessories in pouring shear wall project. Together with Lianggong big plate nut, concrete formwork tie rod and big plate nut act as wall tie system, to fasten the formwork panels tightly during concrete pouring process.  

Packing


3


4

Application


1 (1)


1 (3)


1 (4)


1 (2)


Product detail pictures:

Discountable price Driveworks Tie Rod End - Tie Rod – Lianggong detail pictures

Discountable price Driveworks Tie Rod End - Tie Rod – Lianggong detail pictures

Discountable price Driveworks Tie Rod End - Tie Rod – Lianggong detail pictures

Discountable price Driveworks Tie Rod End - Tie Rod – Lianggong detail pictures


Related Product Guide:

abide by the contract", conforms on the market requirement, joins from the market competition by its good quality likewise as provides more comprehensive and superb support for customers to let them become large winner. The pursue of the company, is definitely the clients' pleasure for Discountable price Driveworks Tie Rod End - Tie Rod – Lianggong , The product will supply to all over the world, such as: Kenya, Spain, Finland, We win many reliable customers by rich experience, advanced equipments, skilled teams, strict quality control and best service. We can guarantee all our products. Customers' benefit and satisfaction are always our biggest goal. Please contact us. Give us a chance, give you a surprise.
  • In China, we have purchased many times, this time is the most successful and most satisfactory, a sincere and realiable Chinese manufacturer!
    5 Stars By Rita from Seychelles - 2017.08.28 16:02
    It is not easy to find such a professional and responsible provider in today's time. Hope that we can maintain long-term cooperation.
    5 Stars By Caroline from Nicaragua - 2017.09.29 11:19
    Write your message here and send it to us