Discount wholesale Hydrulic Tunnel Linning Trolley - Arch Installation Car – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

High-quality comes 1st; support is foremost; business is cooperation" is our small business philosophy which is regularly observed and pursued by our organization for Modular Formwork, Cost To Get Concrete Poured, Curved Wood Beams, We will continually strive to improve our service and provide the best quality products with competitive prices. Any inquiry or comment is highly appreciated. Please contact us freely.
Discount wholesale Hydrulic Tunnel Linning Trolley - Arch Installation Car – Lianggong Detail:

Product Details

The arch installation vehicle is composed of the automobile chassis, front and rear outriggers, sub-frame, sliding table, mechanical arm, working platform, manipulator, auxiliary arm, hydraulic hoist, etc. The structure is simple, the appearance is beautiful and the atmosphere, the driving speed of the car chassis can reach 80KM/H, the mobility is flexible, and the transition is convenient. One device can take into account multiple facets, reducing equipment investment, using the car chassis power when working, no external connection is required Power supply, fast equipment installation speed, equipped with two robotic arms, the maximum pitch angle of the robotic arm can reach 78 degrees, the telescopic stroke is 5m, and the overall forward and backward sliding distance can reach 3.9m. It can be quickly installed on the step arch.

Characteristics

Safety: Equipped with two robotic arms and two working platforms, workers are far away from the face of the hand, and the working environment is safer;

Manpower saving: only 4 people can complete the steel frame installation and steel mesh laying for one piece of equipment, saving 2-3 people;

Save money: the automobile chassis is flexible and flexible, one device can take care of multiple aspects, reducing equipment investment;

High efficiency: mechanized construction improves work efficiency, and it only takes 30-40 minutes to install a single arch, which speeds up the process cycle;

Two-step Construction Steps

1. Equipment in place

2. Ground connection arch

3. The right arm raises the first arch

4. Raise the left arm, the first arch

5. Aerial docking arch

6. Longitudinal ties

7. Raise the right arm, the second arch

8. Raise the left arm, the second arch

9. Aerial docking arch

10. Welded reinforcement and steel mesh

11. Leave the site quickly after construction

Three-step Construction Steps


2

1. Equipment in place

2. Install the side wall arch of the lower step

3. Install the middle step side wall arch

4. Install the top arch of the upper step

5. Leave the site quickly after construction


Product detail pictures:

Discount wholesale Hydrulic Tunnel Linning Trolley - Arch Installation Car – Lianggong detail pictures


Related Product Guide:

We are commitment to offer you the aggressive price tag ,exceptional products and solutions high-quality, as well as fast delivery for Discount wholesale Hydrulic Tunnel Linning Trolley - Arch Installation Car – Lianggong , The product will supply to all over the world, such as: Lahore, Peru, Venezuela, With the aim of "compete with good quality and develop with creativity" and the service principle of "take customers' demand as orientation", we will earnestly provide qualified products and good service for domestic and international customers.
  • Staff is skilled, well-equipped, process is specification, products meet the requirements and delivery is guaranteed, a best partner!
    5 Stars By Astrid from luzern - 2017.12.09 14:01
    In China, we have many partners, this company is the most satisfying to us, reliable quality and good credit, it is worth appreciation.
    5 Stars By Kevin Ellyson from Sri Lanka - 2018.07.27 12:26
    Write your message here and send it to us