Competitive Price for Protection Screen And Unloading Platform - Hydraulic Auto Climbing Formwork – Lianggong
Competitive Price for Protection Screen And Unloading Platform - Hydraulic Auto Climbing Formwork – Lianggong Detail:
Product Details
The hydraulic auto-climbing formwork system (ACS) is a wall-attached self-climbing formwork system, which is powered by its own hydraulic lifting system. The formwork system (ACS) includes a hydraulic cylinder, an upper and lower commutator, which can switch the lifting power on the main bracket or climbing rail. With the power by the hydraulic system, the main bracket and climbing rail are able to climb respectively. Therefore, the complete hydraulic auto-climbing system (ACS) climbs steadily without crane. No other lifting device is needed when using the hydraulic auto-climbing formwork, which has the advantages of being easy to operate, fast and safe in the climbing process. ACS is the first-choice formwork system for high-rise tower and bridge construction.
Characteristics
1.Hydraulic auto-climbing formwork can climb as a complete set or individually. The climbing process is steady, synchronous and safe.
2.The brackets of the auto-climbing formwork system will not be dismantled until the construction period finished, thus saving space for the site and avoiding damage to the formwork, especially to the panel.
3.It provides all-round operating platforms. The contractors do not need to set up other operating platforms, thus saving the cost on material and labor, and improving safety
4.The error of structure construction is small. As work on correction is simple, the construction error can be eliminated floor by floor.
5.The climbing speed of the formwork system is fast. It can speed up the whole construction work (average 5 days for one floor).
6.The formwork can climb by itself and cleaning work can be done in situ, so that the use of tower crane will be greatly reduced.
Two types of hydraulic auto-climbing formworks: HCB-100&HCB-120
1.Structure diagram of diagonal brace type
Main function indicators
1.Construction load:
Top platform ≤0.75KN/m²
Other platform: 1KN/m²
2.Electronically controlled hydraulic
lifting system
Cylinder stroke: 300mm;
Hydraulic pump station flow: n ×2L /min, n is the number of seats;
Stretching speed: about 300mm/min;
Rated thrust: 100KN & 120KN;
Double cylinder synchronization error: ≤20mm
2.Structure diagram of truss type
Composite truss
Separate truss
Main function indicators
1.Construction load:
Top platform ≤4KN/m²
Other platform: 1KN/m²
2.Electronically controlled hydraulic lifting system
Cylinder stroke: 300mm;
Hydraulic pump station flow: n ×2L /min, n is the number of seats;
Stretching speed: about 300mm/min;
Rated thrust: 100KN & 120KN;
Double cylinder synchronization error: ≤20mm
Introduction to systems of hydraulic auto-climbing formwork
Anchor system
Anchor system is the load bearing system of the whole formwork system. It consists of tensile bolt, anchor shoe, climbing cone, high-strength tie rod and anchor plate. The anchor system is divided into two types:A and B, which can be selected according to requirements.
Anchor system A
①Tensile bolt M42
②Cimbing cone M42/26.5
③High-strength tie rod D26.5/L=300
④Anchor plate D26.5
Anchor system B
①Tensile bolt M36
②Climbing cone M36/D20
③High-strength tie rod D20/L=300
④Anchor plate D20
3.Standard components
Load-bearing bracket
Load-bearing bracket
①Cross beam for load-bearing bracket
②Diagonal brace for load-bearing bracket
③Standard for load-bearing bracket
④ Pin
Retrusive set
Retrusive set assembly
Retrusive tie-rod set
Retrusive set
Medium platform
①Cross beam for medium platform
②Standard for medium platform
③Connector for standard
④Pin
Retrusive set
Wall-attached anchor shoe
Wall-attached device
Bearing pin
Safety pin
Wall-attached seat (left)
Wall-attached seat(right)
Climbing rail
Suspended platform assembly
①Cross beam for suspended platform
②Standard for suspended platform
③Standard for suspended platform
④pin
Main waler
Main waler standard section
①Main waler 1
②Main waler 2
③Upper platform beam
④Diagonal brace for main waler
⑤Pin
Accessories
Adjusting seat
Flange clamp
Waling-to-bracket holder
Pin
Taken out tool for climbing cone
Hairpin
Pin for main waler
4.Hydraulic system
The hydraulic system consists of commutator, hydraulic system and power distribution device.
The upper and lower commutator are important components for the force transmission between the bracket and the climbing rail. Changing the direction of the commutator can realize the respective climbing of the bracket and climbing rail.
Assembly process
①Bracket assembly
②Platform installation
③Bracket lifting
④Truss assembly and operation platform installation
⑤Truss and formwork lifting
Project Application
Shenyang Baoneng Global Financial Center
Ou Bei Bridge
Product detail pictures:
Related Product Guide:
Our commission is to serve our users and clients with best quality and competitive portable digital products for Competitive Price for Protection Screen And Unloading Platform - Hydraulic Auto Climbing Formwork – Lianggong , The product will supply to all over the world, such as: Ethiopia, Mali, Romania, When It produced, it making use of the world's major method for reliable operation, a low failure price, it appropriate for Jeddah shoppers choice. Our enterprise. s situated inside the national civilized cities, the website traffic is very hassle-free, unique geographical and financial circumstances. We pursue a "people-oriented, meticulous manufacturing, brainstorm, make brilliant" company philosophy. Strict good quality management, fantastic service, affordable cost in Jeddah is our stand around the premise of competitors. If needed, welcome to make contact with us by our web page or phone consultation, we will be delighted to serve you.
By Sahid Ruvalcaba from Vietnam - 2017.09.22 11:32
In general, we are satisfied with all aspects, cheap, high-quality, fast delivery and good procuct style, we will have follow-up cooperation!
By Rosalind from Turin - 2017.06.16 18:23