With our rich working experience and thoughtful companies, we have now been recognized as being a trustworthy supplier for a lot of global potential buyers for Ready To Pour Concrete, Wall Column Formwork, Kuwait Column Formwork, Please sense no cost to speak to us anytime. We are going to reply you when we receive your inquiries. Remember to note that samples are available before we start our business enterprise.
Cheapest Price Steps To Pouring Concrete Slab - Precast Steel Formwork – Lianggong Detail:

Product Details

Precast girder formwork has advantages of high-precision, simple structure,retractile,easy-demoulding and simple operation. It can be hoisted or dragged to casting site integrally, and demoulded integrally or piecemeal after concrete achieving the strength, then pull out the inner mould from the girder. It is handy installing and debugging, low labor intensity, and high efficient.

The bridge viaduct is divided into small segments, that are prefabricated in the good quality control casting yard, then, delivered to install by good erection equipment.

00

Key componets

1. Casting yard and segment production(geometry control program and software)

2. Segment erection/ installation and equipments

Segment casting yard components


1597374036(1)

1. Short-line match casting and casting mould units

2. Production and working space

  • rebar assembly

  • prestressing work

  • segment touch-up/ repair

  • ready-mixed concrete plant

3. Lifting equipments

4. Storage area

Characteristics

1. Construction Simplicity
• Easier installation of external post-tensioned tendons

2. Time Savings/Cost Effectiveness
• Precast segment to be prefabricated and stored at casting yard while foundation and sub-structure are being built.
• By using efficient erection method and equipment, the rapid installation of viaduct can be achieved.

3. Quality Control Q – A/QC
• Precast segment to be produced in factory-manner condition w/ good quality control.
• Minimum interruption natural impacts such as bad weather, rain.
• Minimum waste of material
• Good precision in production

4. Inspection and Maintenance
• External prestressing tendons can be easily inspected and repaired if required.
• Maintenance program can be scheduled.


_20200814110414


1597374006(1)

Packing

1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.

2. Different packages are used for different products:
—Bundles: timber beam, steel props, tie rod, etc.
—Pallet: small parts will be put in bags and then on pallets.
—Wooden cases: it is available on customer’s request.
—Bulk: some irregular goods will be loaded in bulk in container.

Delivery

1. Production: For full container, normally we need 20-30 days after receive customer’s down payment.

2. Transportation: It depends on the destination charge port.

3. Negotiation is needed for special requirements.


Product detail pictures:

Cheapest Price Steps To Pouring Concrete Slab - Precast Steel Formwork – Lianggong detail pictures

Cheapest Price Steps To Pouring Concrete Slab - Precast Steel Formwork – Lianggong detail pictures

Cheapest Price Steps To Pouring Concrete Slab - Precast Steel Formwork – Lianggong detail pictures


Related Product Guide:

Our company sticks to the principle of "Quality is the life of the company, and reputation is the soul of it" for Cheapest Price Steps To Pouring Concrete Slab - Precast Steel Formwork – Lianggong , The product will supply to all over the world, such as: Juventus, Japan, Iceland, So far our products have been exported to east Europe, the Middle East, Southeast, Africa and South America etc. We have 13years professional sales and purchase in Isuzu parts at home and abroad and the ownership of the modernized electronic Isuzu parts checking systems. We honor our core principal of Honesty in business, priority in service and will do our best to offer our customers with high quality products and excellent service.
  • This is the first business after our company establish, products and services are very satisfying, we have a good start, we hope to cooperate continuous in the future!
    5 Stars By Jeff Wolfe from Jamaica - 2017.03.28 16:34
    Factory equipment is advanced in the industry and the product is fine workmanship, moreover the price is very cheap, value for money!
    5 Stars By Agustin from Stuttgart - 2018.04.25 16:46
    Write your message here and send it to us