Bottom price Tie Rod End Reconditioning - Tie Rod – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

Always customer-oriented, and it's our ultimate goal to get not only by far the most reputable, trustable and honest supplier, but also the partner for our customers for Imitation Wood Beams, Tie Rod Kancil, Plastic Formwork In Thailand, We, with great passion and faithfulness, are willing to provide you with perfect services and striding forward with you to create a bright future.
Bottom price Tie Rod End Reconditioning - Tie Rod – Lianggong Detail:

Product Details

Formwork tie rod performs as the most important member in tie rod system, fastening formwork panels. Usually used together with wing nut, waler plate, water stop, etc. Also it is enbeded in concrete used as lost part.

Tie rods are often used in steel structures, such as bridges, industrial buildings, tanks, towers, and cranes. In ships, tie rods are bolts which keep the whole engine structure under compression. They provide for fatigue strength. They also provide for proper running gear alignment which prevents fretting.

Concrete formwork tie rod can be in cold rolled and hot rolled.

Cold rolled tie rod is in steel grade S235 and S450.

Hot rolled tie rod is also called rebar in steel grade ST500 -1100. Hot rolled rebar popular steel grade is in ST 830, ST 930 ST1100 in concrete construction.

Formwork tie rod are used together with formwork tie nuts include anchor flange nut, wing nut with base plate, water stopper barriers, wedge clamp, Hex Nut, dome nut etc. Inner thread of the tie nuts must be matched up with the tie rod size thread screw.

The formwork tie rod size can be in D12-D50mm. The most popular size of tie rod no matter cold rolled or hot rolled, is in D15, D16, D17, D20, D22mm for construction slab, wall and beams

Formwork tie rod length is always in customized from 1m to 12mtr.

Concrete formwork tie rod can be in black or zinc-plated(whilte or yellow golden color) from wellmade scaffold, China leading OEM scaffolding formwork manufacturer, ISO&CE, 50,000m2 auto to 49 countries.

Lianggong formwork tie rod is one of the most important accessories in pouring shear wall project. Together with Lianggong big plate nut, concrete formwork tie rod and big plate nut act as wall tie system, to fasten the formwork panels tightly during concrete pouring process.  

Packing


3


4

Application


1 (1)


1 (3)


1 (4)


1 (2)


Product detail pictures:

Bottom price Tie Rod End Reconditioning - Tie Rod – Lianggong detail pictures

Bottom price Tie Rod End Reconditioning - Tie Rod – Lianggong detail pictures

Bottom price Tie Rod End Reconditioning - Tie Rod – Lianggong detail pictures

Bottom price Tie Rod End Reconditioning - Tie Rod – Lianggong detail pictures


Related Product Guide:

As for competitive selling prices, we believe that you will be searching far and wide for anything that can beat us. We will state with absolute certainty that for such excellent at such charges we are the lowest around for Bottom price Tie Rod End Reconditioning - Tie Rod – Lianggong , The product will supply to all over the world, such as: Malawi, San Diego, Peru, Due to our dedication, our products are well known throughout the world and our export volume continuously grows every year. We will continue to strive for excellence by providing high quality products that will exceed the expectation of our customers.
  • In China, we have purchased many times, this time is the most successful and most satisfactory, a sincere and realiable Chinese manufacturer!
    5 Stars By Julia from South Africa - 2017.11.01 17:04
    Hope that the company could stick to the enterprise spirit of "Quality, Efficiency, Innovation and Integrity", it will be better and better in the future.
    5 Stars By Maggie from Victoria - 2018.11.11 19:52
    Write your message here and send it to us