Best quality Trench Box Design - Arch Installation Car – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

We pursue the administration tenet of "Quality is superior, Services is supreme, Standing is first", and will sincerely create and share success with all customers for Film Face Plywood, 15x17 Stainless Steel Propeller, Rolling Scaffold Tower, Our company is working by the operation principle of "integrity-based, cooperation created, people oriented, win-win cooperation". We hope we can have a friendly relationship with businessman from all over the world.
Best quality Trench Box Design - Arch Installation Car – Lianggong Detail:

Product Details

The arch installation vehicle is composed of the automobile chassis, front and rear outriggers, sub-frame, sliding table, mechanical arm, working platform, manipulator, auxiliary arm, hydraulic hoist, etc. The structure is simple, the appearance is beautiful and the atmosphere, the driving speed of the car chassis can reach 80KM/H, the mobility is flexible, and the transition is convenient. One device can take into account multiple facets, reducing equipment investment, using the car chassis power when working, no external connection is required Power supply, fast equipment installation speed, equipped with two robotic arms, the maximum pitch angle of the robotic arm can reach 78 degrees, the telescopic stroke is 5m, and the overall forward and backward sliding distance can reach 3.9m. It can be quickly installed on the step arch.

Characteristics

Safety: Equipped with two robotic arms and two working platforms, workers are far away from the face of the hand, and the working environment is safer;

Manpower saving: only 4 people can complete the steel frame installation and steel mesh laying for one piece of equipment, saving 2-3 people;

Save money: the automobile chassis is flexible and flexible, one device can take care of multiple aspects, reducing equipment investment;

High efficiency: mechanized construction improves work efficiency, and it only takes 30-40 minutes to install a single arch, which speeds up the process cycle;

Two-step Construction Steps

1. Equipment in place

2. Ground connection arch

3. The right arm raises the first arch

4. Raise the left arm, the first arch

5. Aerial docking arch

6. Longitudinal ties

7. Raise the right arm, the second arch

8. Raise the left arm, the second arch

9. Aerial docking arch

10. Welded reinforcement and steel mesh

11. Leave the site quickly after construction

Three-step Construction Steps


2

1. Equipment in place

2. Install the side wall arch of the lower step

3. Install the middle step side wall arch

4. Install the top arch of the upper step

5. Leave the site quickly after construction


Product detail pictures:

Best quality Trench Box Design - Arch Installation Car – Lianggong detail pictures


Related Product Guide:

Our personnel are always inside the spirit of "continuous improvement and excellence", and together with the outstanding excellent goods, favorable price and good after-sales services, we try to gain every customer's trust for Best quality Trench Box Design - Arch Installation Car – Lianggong , The product will supply to all over the world, such as: Hanover, Buenos Aires, Chicago, Faced with the vitality of the global wave of economic integration, we are confident with our high-quality products and sincerely service to all our customers and wish we can cooperate with you to create a brilliant future.
  • Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
    5 Stars By Margaret from Egypt - 2018.12.30 10:21
    Perfect services, quality products and competitive prices, we have work many times, every time is delighted, wish continue to maintain!
    5 Stars By Klemen Hrovat from Benin - 2017.10.27 12:12
    Write your message here and send it to us