8 Year Exporter Tire Rod Cost - Tie Rod – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

We have now sophisticated machines. Our solutions are exported to the USA, the UK and so on, enjoying a great reputation amid consumers for Plastic Formwork In Middle-East, Wall Formwork In Indonesia, The Shuttering, We can customize the products according to your requirements and we can pack it for you when you order.
8 Year Exporter Tire Rod Cost - Tie Rod – Lianggong Detail:

Product Details

Formwork tie rod performs as the most important member in tie rod system, fastening formwork panels. Usually used together with wing nut, waler plate, water stop, etc. Also it is enbeded in concrete used as lost part.

Tie rods are often used in steel structures, such as bridges, industrial buildings, tanks, towers, and cranes. In ships, tie rods are bolts which keep the whole engine structure under compression. They provide for fatigue strength. They also provide for proper running gear alignment which prevents fretting.

Concrete formwork tie rod can be in cold rolled and hot rolled.

Cold rolled tie rod is in steel grade S235 and S450.

Hot rolled tie rod is also called rebar in steel grade ST500 -1100. Hot rolled rebar popular steel grade is in ST 830, ST 930 ST1100 in concrete construction.

Formwork tie rod are used together with formwork tie nuts include anchor flange nut, wing nut with base plate, water stopper barriers, wedge clamp, Hex Nut, dome nut etc. Inner thread of the tie nuts must be matched up with the tie rod size thread screw.

The formwork tie rod size can be in D12-D50mm. The most popular size of tie rod no matter cold rolled or hot rolled, is in D15, D16, D17, D20, D22mm for construction slab, wall and beams

Formwork tie rod length is always in customized from 1m to 12mtr.

Concrete formwork tie rod can be in black or zinc-plated(whilte or yellow golden color) from wellmade scaffold, China leading OEM scaffolding formwork manufacturer, ISO&CE, 50,000m2 auto to 49 countries.

Lianggong formwork tie rod is one of the most important accessories in pouring shear wall project. Together with Lianggong big plate nut, concrete formwork tie rod and big plate nut act as wall tie system, to fasten the formwork panels tightly during concrete pouring process.  

Packing


3


4

Application


1 (1)


1 (3)


1 (4)


1 (2)


Product detail pictures:

8 Year Exporter Tire Rod Cost - Tie Rod – Lianggong detail pictures

8 Year Exporter Tire Rod Cost - Tie Rod – Lianggong detail pictures

8 Year Exporter Tire Rod Cost - Tie Rod – Lianggong detail pictures

8 Year Exporter Tire Rod Cost - Tie Rod – Lianggong detail pictures


Related Product Guide:

We emphasize advancement and introduce new products into the market each year for 8 Year Exporter Tire Rod Cost - Tie Rod – Lianggong , The product will supply to all over the world, such as: San Diego, New Orleans, kazan, Actually need to any of those objects be of interest to you, make sure you allow us to know. We'll be delighted to present you a quotation on receipt of one's comprehensive specs. We've our individual specialist R&D enginners to meet any of the requriements, We look forward to receiving your enquires soon and hope to have the chance to work together with you inside the future. Welcome to take a look at our organization.
  • Problems can be quickly and effectively resolved, it is worth to be trust and working together.
    5 Stars By Adelaide from Kuala Lumpur - 2017.10.23 10:29
    Hope that the company could stick to the enterprise spirit of "Quality, Efficiency, Innovation and Integrity", it will be better and better in the future.
    5 Stars By olivier musset from Peru - 2018.05.22 12:13
    Write your message here and send it to us