"Control the quality by the details, show the strength by quality". Our company has strived to establish a highly efficient and stable staff team and explored an effective quality control process for 6x6 Concrete Slab Cost, Concrete Pourer, Poured Concrete Foundation Cost, As we're moving forward, we continue to keep an eye on our ever-expanding merchandise range and make improvement to our services.
2021 Latest Design Beam Bottom Shuttering - Precast Steel Formwork – Lianggong Detail:

Product Details

Precast girder formwork has advantages of high-precision, simple structure,retractile,easy-demoulding and simple operation. It can be hoisted or dragged to casting site integrally, and demoulded integrally or piecemeal after concrete achieving the strength, then pull out the inner mould from the girder. It is handy installing and debugging, low labor intensity, and high efficient.

The bridge viaduct is divided into small segments, that are prefabricated in the good quality control casting yard, then, delivered to install by good erection equipment.

00

Key componets

1. Casting yard and segment production(geometry control program and software)

2. Segment erection/ installation and equipments

Segment casting yard components


1597374036(1)

1. Short-line match casting and casting mould units

2. Production and working space

  • rebar assembly

  • prestressing work

  • segment touch-up/ repair

  • ready-mixed concrete plant

3. Lifting equipments

4. Storage area

Characteristics

1. Construction Simplicity
• Easier installation of external post-tensioned tendons

2. Time Savings/Cost Effectiveness
• Precast segment to be prefabricated and stored at casting yard while foundation and sub-structure are being built.
• By using efficient erection method and equipment, the rapid installation of viaduct can be achieved.

3. Quality Control Q – A/QC
• Precast segment to be produced in factory-manner condition w/ good quality control.
• Minimum interruption natural impacts such as bad weather, rain.
• Minimum waste of material
• Good precision in production

4. Inspection and Maintenance
• External prestressing tendons can be easily inspected and repaired if required.
• Maintenance program can be scheduled.


_20200814110414


1597374006(1)

Packing

1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.

2. Different packages are used for different products:
—Bundles: timber beam, steel props, tie rod, etc.
—Pallet: small parts will be put in bags and then on pallets.
—Wooden cases: it is available on customer’s request.
—Bulk: some irregular goods will be loaded in bulk in container.

Delivery

1. Production: For full container, normally we need 20-30 days after receive customer’s down payment.

2. Transportation: It depends on the destination charge port.

3. Negotiation is needed for special requirements.


Product detail pictures:

2021 Latest Design Beam Bottom Shuttering - Precast Steel Formwork – Lianggong detail pictures

2021 Latest Design Beam Bottom Shuttering - Precast Steel Formwork – Lianggong detail pictures

2021 Latest Design Beam Bottom Shuttering - Precast Steel Formwork – Lianggong detail pictures


Related Product Guide:

We emphasize progress and introduce new solutions into the market each year for 2021 Latest Design Beam Bottom Shuttering - Precast Steel Formwork – Lianggong , The product will supply to all over the world, such as: Norway, Colombia, United States, Our domestic website's generated over 50, 000 purchasing orders every year and quite successful for internet shopping in Japan. We would be happy to have an opportunity to do business with your company. Looking forward to receiving your message !
  • The customer service staff's attitude is very sincere and the reply is timely and very detailed, this is very helpful for our deal,thank you.
    5 Stars By Diana from Senegal - 2017.01.28 18:53
    The company account manager has a wealth of industry knowledge and experience, he could provide appropriate program according our needs and speak English fluently.
    5 Stars By Carlos from Swedish - 2018.11.11 19:52
    Write your message here and send it to us