18 Years Factory Inner Outer Tie Rod - Tie Rod – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

Our advantages are lower prices,dynamic sales team,specialized QC,strong factories,high quality products and services for Construction Scaffolding, Column Formwork, 15x15 Concrete Slab Cost, With advantage of industry management, the company has always been committed to supporting customers to become the market leader in their respective industries.
18 Years Factory Inner Outer Tie Rod - Tie Rod – Lianggong Detail:

Product Details

Formwork tie rod performs as the most important member in tie rod system, fastening formwork panels. Usually used together with wing nut, waler plate, water stop, etc. Also it is enbeded in concrete used as lost part.

Tie rods are often used in steel structures, such as bridges, industrial buildings, tanks, towers, and cranes. In ships, tie rods are bolts which keep the whole engine structure under compression. They provide for fatigue strength. They also provide for proper running gear alignment which prevents fretting.

Concrete formwork tie rod can be in cold rolled and hot rolled.

Cold rolled tie rod is in steel grade S235 and S450.

Hot rolled tie rod is also called rebar in steel grade ST500 -1100. Hot rolled rebar popular steel grade is in ST 830, ST 930 ST1100 in concrete construction.

Formwork tie rod are used together with formwork tie nuts include anchor flange nut, wing nut with base plate, water stopper barriers, wedge clamp, Hex Nut, dome nut etc. Inner thread of the tie nuts must be matched up with the tie rod size thread screw.

The formwork tie rod size can be in D12-D50mm. The most popular size of tie rod no matter cold rolled or hot rolled, is in D15, D16, D17, D20, D22mm for construction slab, wall and beams

Formwork tie rod length is always in customized from 1m to 12mtr.

Concrete formwork tie rod can be in black or zinc-plated(whilte or yellow golden color) from wellmade scaffold, China leading OEM scaffolding formwork manufacturer, ISO&CE, 50,000m2 auto to 49 countries.

Lianggong formwork tie rod is one of the most important accessories in pouring shear wall project. Together with Lianggong big plate nut, concrete formwork tie rod and big plate nut act as wall tie system, to fasten the formwork panels tightly during concrete pouring process.  

Packing


3


4

Application


1 (1)


1 (3)


1 (4)


1 (2)


Product detail pictures:

18 Years Factory Inner Outer Tie Rod - Tie Rod – Lianggong detail pictures

18 Years Factory Inner Outer Tie Rod - Tie Rod – Lianggong detail pictures

18 Years Factory Inner Outer Tie Rod - Tie Rod – Lianggong detail pictures

18 Years Factory Inner Outer Tie Rod - Tie Rod – Lianggong detail pictures


Related Product Guide:

"Sincerity, Innovation, Rigorousness, and Efficiency" could be the persistent conception of our organization for your long-term to establish alongside one another with shoppers for mutual reciprocity and mutual benefit for 18 Years Factory Inner Outer Tie Rod - Tie Rod – Lianggong , The product will supply to all over the world, such as: Serbia, Iran, Provence, We will supply much better products with diversified designs and professional services. We sincerely welcome friends from over the world to visit our company and cooperate with us on the basis of long-term and mutual benefits.
  • This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Jo from Sweden - 2018.09.16 11:31
    Factory equipment is advanced in the industry and the product is fine workmanship, moreover the price is very cheap, value for money!
    5 Stars By Heloise from Belgium - 2017.04.28 15:45
    Write your message here and send it to us