Sticking for the perception of "Creating products of top quality and producing friends with people today from all around the world", we constantly place the desire of shoppers to start with for Ready To Pour Concrete, Scaffold Swivel Base Plate, Cost To Pour Cement Slab, We welcome new and previous customers from all walks of lifetime to speak to us for future organization relationships and mutual achievement!
18 Years Factory Cost To Lay Concrete - Precast Steel Formwork – Lianggong Detail:

Product Details

Precast girder formwork has advantages of high-precision, simple structure,retractile,easy-demoulding and simple operation. It can be hoisted or dragged to casting site integrally, and demoulded integrally or piecemeal after concrete achieving the strength, then pull out the inner mould from the girder. It is handy installing and debugging, low labor intensity, and high efficient.

The bridge viaduct is divided into small segments, that are prefabricated in the good quality control casting yard, then, delivered to install by good erection equipment.

00

Key componets

1. Casting yard and segment production(geometry control program and software)

2. Segment erection/ installation and equipments

Segment casting yard components


1597374036(1)

1. Short-line match casting and casting mould units

2. Production and working space

  • rebar assembly

  • prestressing work

  • segment touch-up/ repair

  • ready-mixed concrete plant

3. Lifting equipments

4. Storage area

Characteristics

1. Construction Simplicity
• Easier installation of external post-tensioned tendons

2. Time Savings/Cost Effectiveness
• Precast segment to be prefabricated and stored at casting yard while foundation and sub-structure are being built.
• By using efficient erection method and equipment, the rapid installation of viaduct can be achieved.

3. Quality Control Q – A/QC
• Precast segment to be produced in factory-manner condition w/ good quality control.
• Minimum interruption natural impacts such as bad weather, rain.
• Minimum waste of material
• Good precision in production

4. Inspection and Maintenance
• External prestressing tendons can be easily inspected and repaired if required.
• Maintenance program can be scheduled.


_20200814110414


1597374006(1)

Packing

1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.

2. Different packages are used for different products:
—Bundles: timber beam, steel props, tie rod, etc.
—Pallet: small parts will be put in bags and then on pallets.
—Wooden cases: it is available on customer’s request.
—Bulk: some irregular goods will be loaded in bulk in container.

Delivery

1. Production: For full container, normally we need 20-30 days after receive customer’s down payment.

2. Transportation: It depends on the destination charge port.

3. Negotiation is needed for special requirements.


Product detail pictures:

18 Years Factory Cost To Lay Concrete - Precast Steel Formwork – Lianggong detail pictures

18 Years Factory Cost To Lay Concrete - Precast Steel Formwork – Lianggong detail pictures

18 Years Factory Cost To Lay Concrete - Precast Steel Formwork – Lianggong detail pictures


Related Product Guide:

We enjoy a very good reputation among our customers for our excellent product quality, competitive price and the best service for 18 Years Factory Cost To Lay Concrete - Precast Steel Formwork – Lianggong , The product will supply to all over the world, such as: Brazil, Portland, Honduras, Furthermore, all of our items are manufactured with advanced equipment and strict QC procedures in order to ensure high quality. If you are interested in any of our goods, please don't hesitate to contact us. We will do our best to meet your needs.
  • In China, we have many partners, this company is the most satisfying to us, reliable quality and good credit, it is worth appreciation.
    5 Stars By Rose from Dubai - 2017.08.21 14:13
    The product manager is a very hot and professional person, we have a pleasant conversation, and finally we reached a consensus agreement.
    5 Stars By Laurel from Oman - 2017.01.11 17:15
    Write your message here and send it to us